Glückstadt - Ramsgate
Montana has spent the last few weeks in Glückstadt. Here the acceptance by the SeeBG took place successfully. Furthermore some parts were repaired, renewed or replaced. For example, the entire gas system including the gas stove, the hot water boiler and the bow thruster. An emergency battery for the radio system was installed. New bed linen and dishes were purchased as well as six new life jackets with sprayhood and emergency light and much more.
On August 13th Markus left Glückstadt with 3 fellow sailors and arrived in Ramsgate, England today. It was a "tough ride" - three days against 30-40kt wind.
It turned out again that the Montana was designed and built for such conditions. Nevertheless, the crew deserves a break now.